Putney Bridge

As of 14 July 2014, Putney Bridge was closed for three months, except to pedestrians and dismounted cyclists, to undergo essential repairs by Wandsworth council to protect the bridge from damage caused by water penetration, which has contributed to the grade 2 listed structure’s poor road surface. While the bridge was closed for repair the original lighting columns and…

A30 Launceston

AREA 1 Gary Taylor-Harris – PSR Lighting and Signs TASK INSTRUCTION Take down and relocate 2no advance directional signs. Install passive jerol posts in sockets installed by others. Remove old posts by cutting posts 150mm below ground level. Induction booked onsite for 0730.   Old sign to be removed RISK ASSESSMENTS REVIEWED Removal of advance directional sign.…